Machine Setup & Installation; Uncrating Machine; Installing Batteries - Ice i20NBL+ Operator's Manual

Table of Contents

Advertisement

OPERATOR MANUAL
MACHINE SET UP & INSTALLATION
Be sure and check packing carton for any damage. Immediately report any damage to carrier.
Check the contents of package to ensure that the following items are included:
Machine,
Lithium-ion Batteries,
Squeegee assembly.
Uncrate the wooden box, place the top board on the edge of pallet, lay it in the front of the machine
Installing Batteries (for i-Synergy machines only)
The machine uses Lithium-ion batteries, the batteries are already in the machine upon delivery; however you
will need to connect the Lithium-ion batteries to the machine.
1.
Open recovery tank to gain access to bat-
tery compartment.
2.
Place the battery brace at the
rear of the batteries.
Figure 1
WARNING:
Fire or Explosion Hazard.
Keep sparks and open flames away!
Keep battery compartment open when charging.
16

Uncrating Machine

Battery Charger (in-build)
Pad Driver
Brush
3.
Plug the batteries connector to the ma-
chine adaptor, connect machine i-Synergy
COM port with the batteries. (See Fig, 1
and 2)
Figure 2
i20NBL+ / i20NBTL+/ i20NBTL+-OB / i24BTL+
TM

Advertisement

Table of Contents
loading

This manual is also suitable for:

20nbl+-obI20nbtl+I24btl+

Table of Contents