Siemens VersiCharge AC Wallbox IEC Operating Instructions Manual page 71

Table of Contents

Advertisement

Appendix
A.3 Installation and maintenance schedule
Wallbox checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A- 1
Installation and maintenance schedule
Action
Mark and drill holes
Mount Wallbox
Assemble and connect the connection cable
Visual and functional check for mechanical damage
Type 2 plug or lid
Housing
Commissioning with the mobile app / PC tool
Check
Fault message
Backend connection (e.g. Siemens Device Management)
SIM card
Cleaning
Check charging sockets or charging cables
Charging cable and plug for damage
Measurements acc. to DIN VDE, e.g.:
Insulation measurement
Grounding resistance measurement
Loop impedance measurement
Generate maintenance log
Function test
Trial charge (with commercial or electric vehicle)
Setup time
Indication of the next test date
Read out meter readings
Travel time
*Scope and duration may vary as they depend on local regulations.
70
Installa-
Commis-
tion/asse
sioning
mbly
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
VersiCharge AC Wallbox IEC
Operating Instructions, 12/2021, A5E50366109-AA
Mainte-
Duration
nance
in min.
5
10
15
x
1
10
x
5
x
5
x
2
x
25*
x
15*
x
10*
x
10*
x
2
x
2
x

Advertisement

Table of Contents
loading

This manual is also suitable for:

Versicharge 8em1310 series

Table of Contents