A.3 Installation and maintenance schedule
Wallbox checklist
The following table shows the tasks and their expected duration for the following
applications:
• Installation/assembly
• Commissioning
• Maintenance
Table A- 1
Installation and maintenance schedule
Action
Mark and drill holes
Mount Wallbox
Assemble and connect the connection cable
Visual and functional check for mechanical damage
•
Type 2 plug or lid
•
Housing
Commissioning with the mobile app / PC tool
Check
•
Fault message
•
Backend connection (e.g. Siemens Device Management)
•
SIM card
Cleaning
Check charging sockets or charging cables
•
Charging cable and plug for damage
Measurements acc. to DIN VDE, e.g.:
•
Insulation measurement
•
Grounding resistance measurement
•
Loop impedance measurement
Generate maintenance log
Function test
•
Trial charge (with commercial or electric vehicle)
Setup time
Indication of the next test date
Read out meter readings
Travel time
*Scope and duration may vary as they depend on local regulations.
70
Installa-
Commis-
tion/asse
sioning
mbly
x
x
x
x
x
x
x
x
x
x
x
x
x
x
x
VersiCharge AC Wallbox IEC
Operating Instructions, 12/2021, A5E50366109-AA
Mainte-
Duration
nance
in min.
5
10
15
x
1
10
x
5
x
5
x
2
x
25*
x
15*
x
10*
x
10*
x
2
x
2
x