2-3. Rack/Tower Installation (only for RT model)
2-3-1 Tower Installation
The UPS system is shipped with two sets of feet and 6 extensions (2 short extensions plus 4 long extensions)
that can be used to tower install the UPS module in 2U or UPS module with one battery bank in 4U.
Install UPS module in 2U
Assemble two feet and one short extension as one tower stand shown in step 1. Align the two stands
approximately 35cm apart in step 2. Then, put UPS module in the stands as shown in step 3.
Step 1
Step 2
Step 3
Install UPS module and one battery bank in 4U
Assemble two feet and two long extensions as one tower stand shown in step 1. Align the two stands
approximately 35cm apart in step 2. Then, put UPS module and battery bank in the stands as shown in step
3.
Step 1
Step 2
Step 3