Installation & Initial Startup; Connect The Loads - PROLiNK PRO850SFCU Quick Start Manual

Line interactive ups
Table of Contents

Advertisement

Available languages

Available languages

4. Installation & Initial Startup
Note:
Before installation, please inspect the unit. Be sure that nothing inside the package
is damaged.
Connect to Utility and Charging
Plug in the AC input cord to the wall outlet. For the best results,
suggest to charge the battery at least 6 hours before initial use. The
unit charges its battery while connecting to the utility.
Placement & Storage Conditions
Install the UPS in a protected area that is free of excessive dust and has adequate air flow. Please
place the UPS away from other units at least 20 cm to avoid interference. DO NOT operate the
UPS where the temperature and humidity is outside the specific limits. (Please check the specs for
the limitations.)

Connect the Loads

Plug in the loads to output receptacles on the rear panel of the UPS. Simply turn on the power
switch of UPS unit, and then devices connected to the UPS will be protected by UPS unit.
CAUTION:
NEVER connect a laser printer or scanner to the UPS unit. This may cause the damage
of the unit.
Connect Communication Cable
To allow for unattended UPS shutdown/start-up and status monitoring, connect the
communication cable one end to the USB port and the other to the communication port of
your PC. With the monitoring software installed, you can schedule UPS shutdown/start-up
and monitor UPS status through PC.
Turn On/Off the Unit
Turn on the UPS unit by pressing the power switch. Turn off the UPS unit by pressing again the
power switch.
20cm
20cm
6 Hours
EN 4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents