Delta PCS100 Installation Manual page 26

Power conditioning system
Hide thumbs Also See for PCS100:
Table of Contents

Advertisement

CAUTION!
!
T
HE UNIT WEIGHS APPROXIMATELY
ANY LIFTING DEVICE MUST BE RATED TO WITHSTAND THE MAXIMUM REQUIRED WEIGHT
CAUTION!
!
T
HE UNIT SHOULD NOT BE INSTALLED WITH THE CABINET DOORS OPEN
13. Locate the eye bolts on each corner of the PCS100.
14. Check the eye bolts are properly tightened to frame.
WARNING!
!
Before proceeding with the normal operation of the hoist, the operator (s) must be trained
accordance with the hoist manufacturer's operation manual. Failure to read and comply with
any of the instructions and limitations noted in this manual and the hoist manufacturer's
manual can result in product failure, serious bodily injury or death, and/or property damage.
Follow the initial start-up procedures for the hoist as described in the manufacturer's operation manual.
Do not attempt operation until all start-up procedures have been fulfilled.
The load attachment may differ from the following figure depending on the type of chain hoist used. The
following is a depicting to illustrate a possible scenario.
WARNING!
!
Keep hoist lines plumb. The working load limits of hoisting equipment apply only to freely
suspended loads on plumb hoist lines. If the hoist line is not plumb during load handling, side
loads are created which can destabilize the load and cause structural failure or tip-over, with
little warning.
Installation Manual
310
/ 683
KG
LBS
Eye Bolts for
Positioning with Hoist
Figure 22. Eye Bolts Locations
22
. T
O PREVENT POSSIBLE DAMAGE OR INJURY
.
Installation
.