Install management network I/O cables
Guidelines for installing and connecting management
network cables

Management network A, nodes 1 - 16 cabling

VxRack Node Hardware Installation Guide
52
Use the following illustration as reference for console and management ports on the
switches.
Figure 15 Console and management ports on switches
Note
As cables are installed and connected, dress and tie cables frequently so that excess
slack does not interfere with routing of adjacent cables.
Refer to the management network cable diagrams applicable to your installation:
Management network A, nodes 1 - 16
l
on page 52.
Management network B, nodes 17 - 22
l
cabling
on page 55.
Management network B, nodes 23 - 32
l
cabling
on page 56.
Use Figure 22 and Table 10 to connect cables for the management network A, nodes 1
- 16.

Management network A, nodes 1 - 16 cabling

Management network A, nodes 17 - 22
Management network B, nodes 23 - 32