Test Procedures; Index Of Test Procedures - Club Car IQ Plus 2008 Maintenance And Service Manual Supplement

Hide thumbs Also See for IQ Plus 2008:
Table of Contents

Advertisement

11
ELECTRICAL SYSTEM AND TESTING

TEST PROCEDURES

Using the following procedures, the entire IQ Plus electrical system can be tested without major disassembly
of the vehicle. See following WARNING.
ý
WARNING
• If wires are removed or replaced, make sure wiring and wire harness is properly routed and
secured. Failure to properly route and secure wiring could result in vehicle malfunction,
property damage, personal injury, or death.

INDEX OF TEST PROCEDURES

1. Batteries / Voltage Check
2. Onboard Computer Solenoid Lockout Circuit
3. Solenoid Activating Coil
4. MCOR Voltage
5. A1 and A2 Motor Voltage
6. Tow/Run Switch
7. Circuit Breaker
8. Battery Pack Voltage (Under Load)
9. Key Switch and MCOR Limit Switch Circuit
10. 24-Pin Connector
11. Onboard Computer Silicon-Controlled Rectifier (SCR) Circuit
12. Onboard Computer Gray Wire and Fuse
13. Voltage at Charger Receptacle Red Wire Socket
14. Motor Speed Sensor
15. Solenoid Contacts
16. Forward/Reverse Rocker Switch
17. Reverse Buzzer
18. Rebooting the Onboard Computer
19. Battery Warning Light
20. Walk Away Braking Relay
Page 11-14
2008-2011 IQ Plus Electric Vehicle Maintenance and Service Supplement
Troubleshooting

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Iq plus 2009Iq plus 2010Iq plus 2011

Table of Contents