Snorkel MHP 15/44HD Operator's Manual page 7

Hide thumbs Also See for MHP 15/44HD:
Table of Contents

Advertisement

All manufacturers operating instructions and
safety rules and all employers safety rules
and all OSHA and other government or local
authority safety rules should be strictly
adhered to.
Repairs and adjustments should be made
only by qualified and trained maintenance
personnel.
No modification should be made to the
equipment without prior written consent of
the Snorkel Engineering Department.
Make a pre-start inspection of the MHP at
the beginning of each shift. A malfunctioning
machine must not be used.
Make an inspection of the work place to
locate possible hazards before operating the
MHP.
Additional Information
For ad di tional in for ma tion, con tact your lo cal
dealer or Snor kel at:
Snor kel In ter na tional,
PO Box 1041
Levin 5510
New Zea land
MHP15/44HD – 12885A
Rev F
Introduction
page - v

Advertisement

Table of Contents
loading

Table of Contents