2 POTS, 2 GigE ONT Installation and Maintenance Practice
Riser conduit for
fiber drop cable
6 AWG ground wire
installed from the ONT
to the established MGN
2. If necessary, tie wrap both the #6 ground wire and LPS wire run to the Buried Fiber Drop
riser conduit.
30
ONT
Figure 18. Local Power Source Installation
Power and Alarm leads
require a jacketed, 4 pair
wire of the proper gauge.
Wire run via Customer
provided PVC conduit or
per local practice.
PVC conduit supplied by subscriber
with pull string for UPS low voltage
wiring installed by technician
UPS with battery backup
installed by technician
GFI/non-GFI outlet - highly
recommend non-GFI outlet
61187602G2-5A