Wire Routes And Pre-Terminating The Outer Enclosure; Figure 13. Pre-Terminated Outer Enclosure - ADTRAN Total Access 300 Installation And Maintenance Practice

2 pots, 2 gige ont
Hide thumbs Also See for Total Access 300:
Table of Contents

Advertisement

2 POTS, 2 GigE ONT Installation and Maintenance Practice

Wire Routes and Pre-Terminating the Outer Enclosure

Figure 13
shows the Outer Enclosure with all of the connections pre-cut to proper length, pre-
terminated with the appropriate connectors, and inserted into their appropriate place holders.
The following sections describe these pre-termination procedures which, when completed,
enables the ONT Inner Module to be installed at a later time. However, these pre-termination
steps are unnecessary if the Inner Module and Outer Enclosure are to be installed at the same
time.

Figure 13. Pre-Terminated Outer Enclosure

24
61187602G2-5A

Advertisement

Table of Contents
loading

Table of Contents