Installation - Timeguard SureTime STLW1000 Installation & Operating Instructions Manual

180 pir light controller
Table of Contents

Advertisement

5. Installation

• Ensure the mains supply is switched off and the circuit supply fuses
are removed or the circuit breaker turned off.
• An isolating switch should be installed to enable the power to be switched
ON and OFF for maintenance purposes and to activate the manual/auto
override function.
• Remove the back plate from the PIR light controller.
4
• Mark the position of the mounting holes using the back plate as a template.
Drill out the mounting holes taking care to avoid any joists, electrical cables
or water/gas pipes that may be hidden beneath the surface.
Insert the rawl plugs into the holes.
• Pass the 230V 50Hz mains supply and load cables through the cable entry
point on the back plate, ensuring the grommet(s) is used to maintain the
IP rating of the PIR light controller.
• Fix the back plate to the wall. Take care not to over-tighten the screws
to prevent damage to the back plate. If using a power screwdriver,
use the lowest torque setting.
Insert flat blade screwdriver under
tab and lever in direction 1

Advertisement

Table of Contents
loading

This manual is also suitable for:

Suretime stlb1000

Table of Contents