Tap Installation - Borg & Overstrom U1 Install & Operation Manual

Hide thumbs Also See for U1:
Table of Contents

Advertisement

Installation

Tap Installation

1
Identify a suitable location for the undercounter unit. It should
be positioned within 1.0m of the faucet, and within 2.0m of
suitable services connections. Allow enough space to fit the
ventilation ducting system.
Service Requirements
Water: Mains potable water – internally regulated to 1.3bar. Min
mains pressure 1.3bar.
Electricity: 13A supply – Earth Leakage Protected.
2
When planning and providing
for the connection to the
services, always allow for
easily accessible service isolator
fittings and for the position of an
external water filter.
Borg & Overström
Install & Operation Manual
3
33 - 35mm
Identify a suitable position for the
swan neck faucet. A 33-35mm
(max) hole is required.
5
4
187mm
When positioning to drain over
an existing sink bowl, allow for
the reach of the swan neck or
otherwise the position of any
optional drip tray.
GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

S2

Table of Contents