Borg & Overstrom U1 Install & Operation Manual page 6

Hide thumbs Also See for U1:
Table of Contents

Advertisement

Borg & Overström
5
400mm
Also allow for the height of
the swan neck under any
overhanging cupboard/shelf.
8
Carefully form the needed hole,
using the correct type of cutter
for the work surface material.
Observe all local occupational
health and safety requirements.
11
Install the ventilation system
using the instructions/templates
provided.
Install & Operation Manual
6
Allow for the space needed
for forming the required hole.
Relate the selected position to
the underneath of the counter
and check for any obstructions.
9
Remove the back nut and washer
from the faucet and carefully
feed the connecting pipe tail
and ribbon cable through the
hole formed in the work surface.
Ensure the sealing O ring is pre-
fitted in the base of the faucet.
You may want to apply a thin
bead of silicone sealant also.
12
Fit optional Drip Tray at this
stage (if selected).
6
7
Allow sufficient space for fitting
the back nut to the faucet stem.
10
With the faucet control panel in
the right position, carefully refit
the back washer and nut. Take
care not to over-tighten.
13
Once the ventilation system is
installed, position the unit on the
ducting as instructed and follow
the connection steps on page 9.
GB

Advertisement

Table of Contents
loading

Related Products for Borg & Overstrom U1

This manual is also suitable for:

S2

Table of Contents