Installation

Tap Installation

1
Identify a suitable location for the undercounter unit. It
should be positioned within 1.0m of the faucet, and
within 2.0m of a suitable services connections:
Service Requirements
Water: Mains potable water – 2.0bar recommended. Min 1.0bar
Electricity: 13A supply – Earth Leakage Protected.
3
When planning and providing
for the connection to the
services, always allow for
easily accessible service isolator
fittings and for the position of an
external water filter.
Borg & Overström
Install & Operation Manual
4
50mm/35mm
Identify a suitable position for
the tap. A 50mm (max) hole is
required for a three headed tap,
and a 35mm (max) hole for a
two headed tap.
6
2
Position correctly with at least 150mm behind
the unit, at least 150mm each side and 100mm
above.
5
When positioning to drain over
an existing sink bowl, allow for
the reach of the tap levers or
otherwise the position of any
optional drip tray. 168mm to
middle tap, 148mm to outside
taps.