Borg & Overstrom U1 Install & Operation Manual page 10

Hide thumbs Also See for U1:
Table of Contents

Advertisement

Borg & Overström
2
Air Ducting
Insert ducting box into its cut slot in the Bottom panel. Then insert the air ducting into the ducting box until it reaches its limits.
Then cut the air ducting so that it is flush with the kickboard.
3
Centrally locate the ventilation grille over the kick board cut out, then using self tapping screws, secure the kick plate.
4
Air Flow
The unit must be positioned accurately over the air ducts to ensure optimum airflow.
Install & Operation Manual
Ducting Box
10
Rear Cut
Out
Air Flow
Align duct with
rear cut out
GB