Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
(1) Mains input air breaker
(3) Mains input

Figure 4-20 Input of single-phase mains

4)
Connect the neutral line for mains input to terminal N1, and the live line to terminal
L1, as shown in Figure 4-20.

4.4.5 Installing Input Components of Three-phase Mains and Diesel

To install the input components of three-phase mains and diesel, proceed as follows:
1)
Unpack the power interface box and the air breaker assemblies of the diesel.
2)
Check that enclosure, mains air breaker, diesel air breaker, air breaker interlock
device, and input/output terminal block are all available.
3)
Mount the diesel air breaker assemblies onto the enclosure by following the
instruction in section 4.4 "Installing Outdoor Power Input Components".
4)
Lead phase-A, phase-B, and phase-C wires in the corresponding output terminals
among A, B, and C respectively, as shown in Figure 4-21.
Chapter 4 Installing Outdoor Transmission and
(2) Connecting busbar
(4) Power output
Huawei Technologies Proprietary
4-16
Power Interface Boxes

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606a

Table of Contents