Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
Cast two cement
plinths
Prepare the
channel steel
Position the
channel steel
Drill holes and install
expansion bolts
Fasten the
channel steel

Figure 2-3 Installation flowchart

2.3 Installing Cabinet Base

This section introduces the procedure of installing a cabinet base, including:

Laying out installation position

Casting cement plinth
Positioning the base
Drilling holes and installing expansion bolts
Fastening the base
2.3.1 Laying Out Installation Position
The layout of the BTS3606A cabinet varies with the configuration. The following shows
the installation position of the BTS3606A cabinet in the following two cases:
When only one BTS3606A cabinet is installed.
When the BTS3606A cabinet is configured with a battery cabinet.
Start
Lay out the
installation position
Does the cabinet
N
Y
weight less than
800 kg?
Cast a cement plinth
Position the base
Drill holes
expansion bolts
Fasten the base
End
Huawei Technologies Proprietary
Chapter 2 Installing Cabinet Base or Channel Steel
Install
2-3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606a

Table of Contents