Installing Cables Of Battery Cabinet; Introduction To Cables Of Battery Cabinet - Huawei Airbridge BTS3606 Installation Manual

Cdma base station cabinet installation
Hide thumbs Also See for Airbridge BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
(1) GND cable
(3) –48 V cable
Figure 5-51 Connecting the rest cables
11) Apply silicon gel onto the two electric poles connecting the –48 V cable and the
GND cable for waterproof purpose.
12) Push the sliding plate inside the cabin and user to three M5 screws previously
removed to fix the cover of the battery cabin.
13) Fasten the closing plug of the temperature monitoring cable.
Note:
If battery cabinet is configured, place the terminals inside the battery cabin to
connect to the battery cabinet.
Install heat-shrinkable tube on the battery terminals that are not connected with any
cables to prevent electrical leakage.

5.10 Installing Cables of Battery Cabinet

This section introduces the physical features of the battery cabinet cables and how to
connect the cables inside the cabinet, between cabinets, and to the BTS3606 cabinet.

5.10.1 Introduction to Cables of Battery Cabinet

Table 5-9 describes cables in the battery cabinet.
(2) Temperature monitoring cable
(4) Closing plug
Huawei Technologies Proprietary
5-49
Chapter 5 Installing Cables
(1)
(2)
(3)
(4)
Temperature monitoring cable
-48V
GND

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606a

Table of Contents