Table 5-6 Cables And Number Of Layers To Be Removed - Huawei Airbridge BTS3606 Installation Manual

Cdma base station cabinet installation
Hide thumbs Also See for Airbridge BTS3606:
Table of Contents

Advertisement

Installation Manual – BTS3606A Cabinet Installation
Airbridge BTS3606&3606A CDMA Base Station
If you are using cables provided by Huawei, you can remove the core layers
according to Table 5-6.

Table 5-6 Cables and number of layers to be removed

L wire (10 mm
L wire (16 mm
L wire (25 mm
L wire (35 mm
N wire (25 mm
N wire (35 mm
PGND cable (25 mm
75Ω E1 cable
120Ω E1 cable
100Ω T1 cable
Optical fiber
–48 V power cable of the battery
cabinet (35 mm
GND cable of the battery cabinet (35
mm
Bonding wire of the battery cabinet
(16 mm
Power cable of the heating plate in
the battery cabinet
Access control and temperature
monitoring cable of the battery
cabinet
Caution:
You cannot attach the core layers back to the sealing module once removing
them. Otherwise, the module may become loose. If too many layers are
removed and the two half units cannot join tightly to the cable, replace this
module with a spare one.
Remove the same number of layers from the upper half and lower half of
each sealing module.
Cable
2
2
/11.96 ft
)
2
2
/19.14 ft
)
2
2
/29.9 ft
)
2
2
/41.86 ft
)
2
2
/29.9 ft
)
2
2
/41.86 ft
)
2
/29.9 ft
2
2
/41.86 ft
2
2
/41.86 ft
)
2
2
/19.14 ft
)
Huawei Technologies Proprietary
Module used
B module
C module
C module
C module
C module
C module
2
)
C module
C module
B module
B module
A module
C module
)
C module
B module
B module
B module
5-25
Chapter 5 Installing Cables
Number of layers
to be removed
0
1
2
3
2
3
3
2
2
2
2
3
3
4
4
3

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Airbridge bts3606a

Table of Contents