Download Print this page

Configuration Chart; Installation Instructions - Altronix TROVE T2SSK7F8D Installation Manual

Advertisement

Altronix T2SSK7F8 and T2SSK75F14 Trove S2 kits are pre-assembled and consist of Trove enclosures/backplanes with factory installed Altronix
power supply/chargers and sub-assemblies. Both kits accommodate Lenel-S2 (S2 Security Platform) S2-INST Installation Kit for S2 Network
Node for up to eight (8) (T2SSK7F8(D)) or fourteen (14) (T2SSK75F14(D)) doors in a single enclosure.
Altronix
Model
Number
T2SSK7F8
6.3A/250V
T2SSK7F8D
eFlow104NB
T2SSK75F14
6.3A/ 250V
eFlow102NB
T2SSK75F14D
5A/ 250V
Wiring methods shall be in accordance with the National Electrical Code/NFPA 70/ANSI, and with all local codes and authorities having jurisdiction.
Product is intended for indoor use only.
1. Remove backplane from enclosure. Do not discard hardware.
2. Mark and predrill holes in the wall to line up with the top two/three keyholes in the enclosure. Install two/three upper fasteners and
screws in the wall with the screw heads protruding. Place the enclosure's upper keyholes over the two/three upper screws;
level and secure. Mark the position of the lower three holes. Remove the enclosure. Drill the lower holes and install the three
fasteners. Place the enclosure's upper keyholes over the two/three upper screws. Install the three lower screws and make sure to
tighten all screws.
3. Mount included UL Listed tamper switch (Altronix Model TS112 or equivalent) in desired
location, opposite hinge. Slide the tamper switch bracket onto the edge of the enclosure
approximately 2" from the right side (Fig. 1, pg. 2). Connect tamper switch wiring to the
Access Control Panel input or the appropriate UL Listed reporting device.
To activate alarm signal open the door of the enclosure.
4. Mount S2-INST Installation Kit to backplane, refer to pages 3, 4.
5. Refer to the eFlow Power Supply/Charger Installation Guide for eFlow102NB,
eFlow104NB and corresponding Sub-Assembly Installation Guides for ACM8,
PDS8, VR6 and PD8UL for further installation instructions.
Hardware:
Lock Nut
- 2 -

Configuration Chart:

Maximum Supply
Current for Main and
Aux. Outputs on
Power Supply board
and ACM8(CB) Access
Power Controllers'
outputs
15A/
4.5
24VDC @ 9.7A
32V
24VDC @ 9.4A
15A/
7.5
32V
12VDC @ 10A

Installation Instructions:

Overview:
Nominal DC
Output Voltage
[DC]
[Aux]
Output
Output
Range
Range
(VDC)
(VDC)
20.17-
20.28-
26.4
26.4
20.17-
20.28-
26.4
26.4
9.7-
10.03-
13.2
13.2
3.5A/
250V
10A/
8
8
250V
2.5A
3.5A/
250V
10A/
16
16
250V
2.5A
Enclosure
Edge of
Enclosure
Tamper Switch
(included)
To Access Control Panel or
UL Listed Reporting Device
Trove2 S2 Kits Installation Guide
10A/
3A/
32V
32V
9A
2.5A
3.5A/
250V
2.5A
Fig. 1

Advertisement

loading
Need help?

Need help?

Do you have a question about the TROVE T2SSK7F8D and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

This manual is also suitable for:

Trove t2ssk7f8Trove t2ssk75f14Trove t2ssk75f14d