H&S DEALER PRE-DELIVERY CHECK LIST
AFTER COMPLETION, DEALER SHOULD REMOVE AND RETAIN FOR RECORDS
After the 170 Grinder-Mixer has been completely set-up, check to be certain it is in correct operating order
before delivering to the customer. The following is a list of points to inspect. Check off each item as you
have made the proper adjustments and found the item operating satisfactorily.
Grinder-Mixer was not damaged in shipment. Check for dents and loose or missing parts.
Report damage immediately to H&S Manufacturing Co., Inc.
All bolts and fasteners are tight.
Mixer has been correctly assembled according to instructions in this manual. Wheel nuts and
all other fasteners are tightly secured.
All grease fittings have been lubricated.The transmission and cyclonic reservoir are filled to
proper levels. See Lubrication Chapter of this manual for details.
Hydraulic pump, motors, hoses and fittings are properly attached.
Guards and shields are secure.
Screens fit properly into the mill and the mill cover closes and latches tightly.
Wheels are properly mounted.
Tires are inflated to 80 PSI (563 kpa).
Belts are properly adjusted.
Rear Drive Chain tension is properly adjusted. See Adjustment Chapter of this manual.
Discharge auger door operates smoothly.
Decals are in place and legible.
Lights and wiring functioning properly if applicable.
Connect the Mixer onto a proper horsepower 540 RPM or 1000 RPM (if applicable) tractor and
attach the PTO. Connect the scale and lights if applicable. Run the Grinder-Mixer and make
sure all components operate properly.
PTO guard turns freely.
Hydraulic system does not leak under pressure.
Electronic Scale (if provided) operates properly.
Implement and all components are functioning properly.