Installing The Elhy ® Thruster - EMG ELHY EB 630 Assembly Manual

Table of Contents

Advertisement

6.1.2
Installing the ELHY
ELHY-Montageanleitung_2021_EN.docx
®
thruster
To attach the ELHY
®
motor housing and holes in the lifting rod, which can be used with
suitable bolts to establish the connection to the equipment to be
operated (e.g. brakes).
The diameter and length of the required bolts are specified in the
dimension tables (⇒Technical data chapter, Dimensions section).
When selecting or measuring the bolts (by the customer) the
required pivoting ability of the ELHY
observed.
The ELHY
®
thruster is installed in the following steps:
 Use lifting gear to move the ELHY
installation location.
 Grease the bolt slightly in order to prevent it rusting tight.
 Insert the bolt into the foot hole.
 Insert the bolt into the thrust shackle hole.
NOTICE
Both bolt axes must be parallel as otherwise, the lifting rod jams
and the thruster's free power development is not guaranteed.
 Use cotter pins or similar to secure the bolts to prevent them
slipping out.
Assembly and installation
thruster, there are fastening eyelets on the
®
thruster must be
®
thruster to the required
6
Assembly
6.1
45 / 71

Advertisement

Table of Contents
loading

This manual is also suitable for:

Elhy eb6300

Table of Contents