Getting Started - What's In The Box; Smartrack; Rack - ETC SMARTRACK User Manual

Table of Contents

Advertisement

Smartrack User Manual
3. Getting started – what's in the box

3.1. Smartrack

Smartrack systems are shipped broken down into racks and power assemblies
(up to three per rack). Please check carefully to verify that you have everything
you need before starting the installation.

3.1.1 Rack

Each rack is shipped separately as an empty enclosure, with separately
wrapped door assembly and a number of internal fittings kits, namely:
Remove the door assembly from the carton and store it separately while
the racks are installed and wired. It's not needed until the installation of
the wiring and power assemblies is complete.
page 8
Metalwork Kit
2 x power cable entry cover
2 x load cable entry cover
Hardware Kit
Door Kit
2 x M4 black washer
1 x M4 shakeproof washer
1 x M4/10 Pan Posi Screw
1 x graphics layer number sheet
Entry Cover Kit
32 x M4/6 taptite screw
32 x M4 spring washer
Fan Kit
3 x M5/10 Pan Posi screw
3 x M5 nylon washer
Foot Kit
4 x plastic feet
4 x M5/16 csk screws
4 x plastic plugs
Power Terminal Safety Cover Kit
1 x Plastic Safety Cover
3 x M5/12 taptite screw
ETC Ltd

Advertisement

Table of Contents
loading

Table of Contents