Valor L1 1600KN Installation Manual page 83

Table of Contents

Advertisement

Appendix D—HeatShift System
COMBUSTIBLE Mantel Clearances Linear appliances (when using HeatShift System ONLY)
Sidewall clearances remain as stated in this installation manual.
WARNING
RISK OF OVERHEATING
AND FIRE! Ensure HeatShift
installation is complete AND
internal convection ba
is removed (see HeatShift
installation) when using
these combustible mantel
clearances.
NON-COMBUSTIBLE Flush Hearth/Mantel Projections (when using HeatShift System ONLY)
e
Cement board as specified
in installation manual
packed with appliance
1" Trim
NOTE
These Mantel Clearances apply ONLY
when HeatShift System is installed
45°
10"
6"
Note: Combustible
1" trim
wall finish up to
1" thick may be
installed over
cement board
and butt up to
the 1" trim all
around the opening.
DO NOT COVER
1" trim
THE TRIM
4" minimum to
combustible
hearth
Bottom of Unit
Max. 6" non-combustible
projection allowed top and
bottom, at edge of 1" trim.
Only allowed when using
HeatShift System LDK kit.
Combustible
materials must
be kept behind
this line
Mantel
33-3/4"
Height
(from
Bottom
29-3/4"
of Unit)
23-3/4"
83

Advertisement

Table of Contents
loading

This manual is also suitable for:

L1 1600kpSee-thru l11600kn1600kp

Table of Contents