Installation Planning
Venting Considerations—Vertical Takeoff
12" pipe section
Required
1" clearance
from vertical
pipe to
combustible
material set
Venting Considerations—Horizontal Takeoff
12" pipe section
14
1" clearance required
from vertical pipe to
combustible surfaces
Fireplace
1" clearance required
from vertical pipe to
combustible surfaces
2-1/2"
(64 mm)
Fireplace
Notes—ALL venting considerations
• Dimensions of venting are based on us-
ing Dura-Vent elbows. Elbow curve radius
dimensions will vary when using other
brands and in general are slightly bigger.
• Minimum 12 inches vertical pipe section
This surface is
required right at unit. Refer to venting chart
NOT A SHELF
on page 28 for allowable horizontal runs.
• 3 inches to combustibles required above
horizontal pipe. Slope pipe upwards 1/4
inch per foot. 1 inch clearance required
around sides and bottom of horizontal pipe
and around vertical pipe.
• When calculating eff ective pipe lengths
subtract approximately 1-1/2 inch per pipe
joint - for example, a 12 inches pipe sec-
tion will add approximately 10-1/2 inches
overall.
If installing with a horizontal
surface above the fireplace, do
not use this surface as a shelf.
Do not place objects above the
fireplace as this surface will be
hot.
This surface is
NOT A SHELF
Venting
WARNING

Advertisement

Table of Contents
loading

This manual is also suitable for:

L1 1600kpSee-thru l11600kn1600kp

Table of Contents