Quick Start

1. Click
here
in Safari, Firefox, or Chrome and select the HDC202xEVM GUI from the gallery to access
the cloud-based GUI. The browser window should appear as in
instruction to complete setup.
2. Reload the browser window after installation to access the home screen of the HDC2022EVM GUI.
3. Connect the HDC2022EVM to the USB port of your computer via USB. Drivers for the device will install
automatically and the GUI will connect to the EVM.
4. Temperature and humidity data can be recorded and logged on the data capture tab. Select the
icon to navigate to this page. You can enable register auto-read from this page, and initiate a one-shot
to take sample data.
5. Configure device settings from the device configuration tab
6. Register, bit-field, and bit level configuration can be performed from the register tab
See
Section 4
for more information on GUI tabs, operation, and installation of the local version of the
HDC2022EVM GUI.
SNIU039 – December 2019
Submit Documentation Feedback
Figure 2. HDC2022EVM GUI on first startup
Copyright © 2019, Texas Instruments Incorporated
Figure
2. Follow the onscreen
.
.
HDC2022EVM User's Guide
Quick Start
5

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HDC2022EVM and is the answer not in the manual?

Table of Contents