Software Setup
The PC GUI software for the HDC2022EVM runs on TI's GUI composer framework. The software is
available as a live version which runs in your browser, and is available as a download for offline use. The
software is compatible with Windows, Mac, and Linux Operating systems.
3.1.1
Live Software on dev.ti.com
The live software currently works within Chrome, Firefox and Safari browsers. Internet Explorer and Edge
browsers are not supported. User can access the live version through one of the following actions:
•
Go to the
HDC2022EVM Tool page
•
Go to
dev.ti.com/gallery
Click on the application icon within the gallery to launch the software. Follow the prompts onscreen to
install the TI Cloud Agent Bridge browser plugin.
3.1.2
Offline Software
3.1.2.1
Download GUI from dev.ti.com
Users can access the latest version of the offline software by navigating to the live version as noted
above. Look for the download icon
system as shown in the download pop-up. After download, unzip and run the downloaded executable file.
Follow the onscreen instructions to install the local version of the GUI.
6
HDC2022EVM User's Guide
on TI.com and click on the View Button
and search for the HDC2022EVM.
and download both the application and runtime for the operating
Figure 3. Download Pop-Up
Copyright © 2019, Texas Instruments Incorporated
www.ti.com
SNIU039 – December 2019
Submit Documentation Feedback
Need help?
Do you have a question about the HDC2022EVM and is the answer not in the manual?