EVM Hardware
5.3
Device Address Configuration
The onboard HDC2022's I2C address is set to 1000001xb on the EVM. This is done by setting the ADDR
pin to VDD via a 0 ohm resistor (R4) (refer to
To change the I2C address to 0x40, remove 0 Ω resistor R4 (refer to
Figure 12. HDC2022EVM: Layout Resistors for I2C Address Setting - Top
ADDR
VDD
Float
In
Table
3, the EVM default configuration is in bold.
14
HDC2022EVM User's Guide
Figure
Figure 11. HDC2022EVM : Sensor Module
Table 3. I2C Address
R4
Populated
Removed
Copyright © 2019, Texas Instruments Incorporated
11).
Figure 12
www.ti.com
).
HDC2022 ADDRESS
1000001
1000000
SNIU039 – December 2019
Submit Documentation Feedback
Need help?
Do you have a question about the HDC2022EVM and is the answer not in the manual?