Trademarks; Hdc2022Deb With Eptfe Filter; Device And Package Configurations - Texas Instruments HDC2022EVM User Manual

Table of Contents

Advertisement

The Texas Instruments HDC2022EVM evaluation module (EVM) enables designers to evaluate the
operation and performance of the HDC2022 Relative Humidity and Temperature Sensor.
The EVM contains one HDC2022 (see
DEVICE
U1
The EVM hosts an MSP430F5528 microcontroller (µC) as well as the HDC2022. The µC is used to control
the HDC2022 and communicate with a host PC through a USB port. The EVM is designed to be broken
into two sections if desired. The sensor section can be separated from the µC section of the board to
reduce thermal mass surrounding the HDC2022.
1

Trademarks

All trademarks are the property of their respective owners.
4
HDC2022EVM User's Guide
Table
1).
Table 1. Device and Package Configurations
IC
HDC2022DEB
Figure 1. HDC2022DEB with ePTFE Filter
Copyright © 2019, Texas Instruments Incorporated
HDC2022EVM User's Guide
User's Guide
SNIU039 – December 2019
PACKAGE
WSON (6-pin) DEB
SNIU039 – December 2019
Submit Documentation Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HDC2022EVM and is the answer not in the manual?

Table of Contents