Toshiba RAV-SM304SDT-TR Service Manual page 167

Table of Contents

Advertisement

No.
Part name
Compressor
6
Compressor lead
(Continued)
Procedure
2. Mounting of compressor
1) Mount the compressor in the reverse
procedure of removal.
NOTES:
∗ After exchange of the compressor, be sure to
exchange the compressor lead. (Repair part
code of compressor lead: 43160591)
In this time, wrap the ferrite core with the
compressor lead wire by 4 times.
Using bundling band on the market, bind the
compressor lead. As the compressor lead is
long, be sure that the compressor lead does
not contact with the discharge pipe.
∗ Fix the removed each sensor and PMV coil
lead wire to the discharge pipe and the
suction pipe with the bundling band via the
pipe cover.
In this time, take note that each sensor and
PMV coil lead wire do not come to contact
with the discharge pipe and the reactor.
(For fixing to the discharge pipe, use the
black heat-proof pipe cover and the bundling
band for heat-proof which is sold on the
market.)
∗ As shown in the right figure, mount the
soundproof plate (inner winding, outer
winding) by inserting between the compres-
sor and the piping, and between piping and
the partition plate.
∗ Put the compressor lead wire and the
compressor case thermo between inner
winding and outer winding of the soundproof
as if dropping them in.
Pipe cover, bundling band, TS sensor
Suction pipe
Pipe cover, bundling band,
each sensor (TL, TO, TE, TS sensor)
PMV coil lead
Compressor lead
Pass the soundproof plate (outer winding)
Pass the soundproof plate (outer winding)
Pass the soundproof plate (outer winding)
through between the suction pipe and
through between the suction pipe and
through between the suction pipe and
the accumulator.
the accumulator.
the accumulator.
Accumulator
Accumulator
Accumulator
Header pipe
Header pipe
Header pipe
Pass the soundproof plate
Pass the soundproof plate
Pass the soundproof plate
(inner winding) through
(inner winding) through
(inner winding) through
between compressor and
between compressor and
between compressor and
discharge pipe, suction pipe
discharge pipe, suction pipe
discharge pipe, suction pipe
and then put it on the other
and then put it on the other
and then put it on the other
side at this position.
side at this position.
side at this position.
Discharge pipe
Discharge pipe
Discharge pipe
Do not make clearance between
the soundproof plate (upper) and
the soundproof plate (outer winding).
Black heat-proof pipe cover and
heat-proof bundling band,
each sensor (TL, TO, TE, TD, TS sensor)
PMV coil lead wire
Set each sensor so that it does not
come to contact with the discharge pipe.
PMV coil lead
– 167 –
Remarks
Wind the ferrite core
Wind the ferrite core
Wind the ferrite core
with the compressor
with the compressor
with the compressor
lead wire by 4 times.
lead wire by 4 times.
lead wire by 4 times.
0 to 50
0 to 50
0 to 50
(Positioning
(Positioning
(Positioning
standard of
standard of
standard of
compressor
compressor
compressor
lead wire)
lead wire)
lead wire)
Using the bundling band on the market,
fix the bundle at 2 positions.
Discharge pipe
Discharge pipe
Discharge pipe
Put the soundproof plate
(outer winding) on the
other side at this position.
Soundproof plate
Soundproof plate
Soundproof plate
(upper)
(upper)
(upper)
Soundproof plate
Soundproof plate
Soundproof plate
(outer winding)
(outer winding)
(outer winding)
Ferrite core
Ferrite core
Ferrite core
Suction pipe
Suction pipe
Suction pipe

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents