Toshiba RAV-SM304SDT-TR Service Manual page 163

Table of Contents

Advertisement

No.
Part name
1. Reactor
Exchange of
4
electric parts
(Continued)
NOTE:
Be sure to bind the removed bundling band with
the bundling band on the market.
Be careful that the fan motor lead does not come
to contact with the reactor body.
Procedure
1) Carry out works of 1 of
2) Remove the relay connector connected to
the control P.C. board.
3) Cut off the bundling band binding the
compressor lead and the relay connector.
4) Remove each reactor.
(Truss B tight screw Ø4 × 6, 2 pcs. each)
5) Attach a new reactor.
and
.
1
3
– 163 –
Remarks
Reactor relay connector
(Connected to lead wire
(White) at P.C. board side)
Reactor relay connector
(Connected to lead wire
(Charcoal gray) at P.C. board side)
Fan motor lead
Bundling band
(Compressor lead, reactor lead)
Upper reactor
Connected to reactor relay connector
(Connected to lead wire (White)
at P.C. board side)
Bundling band
Lower reactor
Connected to reactor relay connector
(Connected to lead wire (Charcoal gray)
at P.C. board side)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents