Ram ProMaster
24. Route the wiring harnesses along the step-
well and past the b-pillar. Route the power and
ground connections to the battery box.
Connect the power and ground connections to
the battery.
AAA
25. Route the wiring harnesses up the b-pillar.
Connect the blower-motor electrical connector.
NOTE: The refrigerant valve connector is not
polarity sensitive.
NOTE: It is not necessary to remove the jamb-
nut from the connector housing.
26. Remove the screw from the refrigerant valve
connector and remove the connector plate.
Connect the appropriate wires to terminals 1
and 2. The ground terminal is not used.
21
Vancouver
Need help?
Do you have a question about the ProMaster Vancouver Standard and is the answer not in the manual?