Toner Sensor Voltage Adjustment (Upto Machine 705025000/705530000) - Oce 7050 Technical & Service Manual

Hide thumbs Also See for 7050:
Table of Contents

Advertisement

Adjustments
1 Toner sensor voltage adjustment
(upto machine 705025000/705530000)
This adjustment must be made, when new developer has been added.
Note:
Add new developer (if applicable (See 05 Dev
1
Remove the rear cover.
2
Connect a voltmeter between TP5 and TP1 (GND) on the main controller
3
22PBA01 and adjust with potmeter R55 until the voltage is 7.0 V ± 1V.
Connect the voltmeter between TP4 and TP1 (GND) to measure the sensor
4
voltage.
Run SDS test -2, -2. (See Faults
5
Wait for ± 10 minutes and while the test is still running, adjust potmeter R55
6
until the voltage on TP4 is 2.25V ± 0.02V.
Stop the test.
7
Connect the voltmeter between TP5 and TP1 (GND) and measure the voltage.
8
Read out the value to 2 decimal places and note this value in the logbook chart.
9
(V control = .......V).
ed. 6
TP4
R55
TP5
page
page
26).
TP2
Frontside machine
403)).
TP3
TP1
05 Developing 301

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents