Inverter Assembly - Toshiba RAS-B05J2KVG-E Service Manual

Hide thumbs Also See for RAS-B05J2KVG-E:
Table of Contents

Advertisement

No.
Part name
1) Perform work of item 1 in
Inverter
ƒ
assembly
2) Remove screw (ST2TØ4×10L 2 pcs.) of the
3) Perform discharging by connecting
4) Remove screw (ST2T∅4 x 10L 4pcs.) fixing
5) Remove the front cabinet by performing step
6) Disconnect connectors of various lead wires.
Procedure
upper part of the front cabinet.
• Disconnect connectors all connector on
P.C. board.
• Take off P.C. board out from spacer under
P.C. board.
• If there is no space above the unit, perform
work of 1 in
.
2
Be careful to check the inverter because
high-voltage circuit is incorporated in it.
polarity by discharging resistance (approx.
100Ω40W) or plug of soldering iron to
terminals a of the C07 (printed "CAUTION
HIGH VOLTAGE" is attached.) electrolytic
capacitor (760µF) on P.C. board.
Be careful to discharge the capacitor
because the electrolytic capacitor
cannot naturally discharge and voltage
remains according to trouble type in
some cases.
NOTE
This capacitor is one with mass capacity.
Therefore, it is dangerous that a large
spark generates if short-circuiting
between
,
the terminal part of inverter box to the main
body.
1 in
, and remove the fixing screws
k
(ST2T∅4 x 10L) for securing the main body
and inverter box.
Requirement
As each connector has a lock mecha-
nism, avoid to remove the connector by
holding the lead wire, but by holding the
connector.

.
,
,
The connector is one
with lock, so remove
it while pushing the
part indicated by an
arrow.
Be sure to remove the connector by
holding the connector, not by pulling
the lead wire.
- 117 -
FILE NO. SVM-19001
Remarks
Inverter module cover
P.C. board
(Soldered surface)
Discharging position
Plug of
(Discharging period
10 seconds or more)
soldering iron
Inverter module cover
screw
P.C. board
(component Side)

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents