Toshiba RAS-B05J2KVG-E Service Manual page 107

Hide thumbs Also See for RAS-B05J2KVG-E:
Table of Contents

Advertisement

11-8-5. Checking Method for Each Part
No.
Part name
1
Electrolytic capacitor
(For raising pressure, smoothing)
2
Converter module
Checking procedure
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3. Check that safety valve at the bottom of capacitor is not broken.
4. Check that vessel is not swollen or exploded.
5. Check that electrolytic liquid does not blow off.
6. Check that the normal charging characteristics are show in
continuity test by the tester.
RAS-05, 07, 10, 13J2AVG-E
C07 → 760µF/450V
RAS-16, 18J2AVG-E
C07, C08 → 760µF/400V
1. Turn OFF the power supply breaker.
2. Discharge all three capacitors completely.
3 Check that the normal rectification characteristics are shown in continuity
test by the tester.
1
2
3
Tester rod
1
2
3
1
- 107 -
FILE NO. SVM-19001
Case that product is good
Pointer swings once, and
returns slowly. When
performing test once again
under another polarity, the
pointer should return.
~ ~
+
1 2 3
4
(DB01)
4
Diode check
Resistance value
in good product
4
50kΩ or more
(0Ω in trouble)
4
2
3

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents