Toshiba RAS-B05J2KVG-E Service Manual page 100

Hide thumbs Also See for RAS-B05J2KVG-E:
Table of Contents

Advertisement

(RAS-16, 18)
Diagnosis/Process flowchart
Remove connector
of compressor.
NG
Check 25A fuse
(Part No.F01).
OK
Replace fuse.
Check
electrolytic
capacitor, diode
block (DB01),
Check
NG
terminal voltage
of electrolytic
capacitor.
OK
Check
electrolytic
capacitor, diode
(DB01),
NO
Does outdoor
fan rotate?
YES
Remove connector
CN31 of outdoor fan
NG
motor, and using a
tester, check resistance
value between every
phases at motor side.
Replace
outdoor
fan motor.
A
B
Item
Preparation
Check
Check
etc.
etc.
Operation
Measure-
ment
Check
Stop
OK
Check
Measure-
ment
Contents
Turn "OFF" the power supply
breaker, and remove 3P
connector which connects
inverter and compressor.
• Check whether 25A fuse
on the control board
assembly is blown or not.
(F01)
Turn on the power breaker,
and operate the air condi-
tioner in COOL mode by time
shortening.
Measure terminal voltage of
the electrolytic capacity.
760µF:400V x 2
After operation, turn off the
power breaker after 2
minutes 20 seconds passed,
and discharge the electro-
lytic capacitor by soldering
iron.
Check voltage between
motor phases.
• Is not winding between
R
R
S
Q
S
-
, or
-
opened
or short-circuited?
• Is not frame grounded with
Q
R
S
,
, or
?
- 100 -
FILE NO. SVM-19001
Summary
If fuse was blown, be sure to
check the electrolytic
capacitor and diode block.
(DB01)
• Connect discharge
resistance (approx. 100Ω,
40W) or soldering iron
(plug) between +, –
terminals of the electro-
lytic capacitor (760µF) of
C07 (with printed
WARNING ELECTRIC
SHOCK) on P.C. board.
OK
if 760µF → DC280 to 380V
Remove CN31 whilepushing
the part indicated by an
by an arrow because CN31
is a connector with lock.
Q
-
→ Resistance between
phases should be
approx. 16 to 51Ω
→ Should be 100MΩ or
more.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents