TABLE OF CONTENTS SAFETY QUICK GUIDE COOLER LOCATION REMOVING THE VENTURI REMOVING THE TRANSITION PREPARING THE DROPPER MOUNTING THE DROPPER SECURING THE DROPPER & TRANSITION AutoWinterseal™ CONVEYING THE COOLER TO THE ROOF MOUNTING THE COOLER CABLE INSTALLATION ELECTRICAL REQUIREMENTS FIELD WIRING DIAGRAM WATER REQUIREMENTS INSTALLING THE FLOAT VALVE INSTALLING THE INLET SOLENOID...
• What could the possible consequence be? • What can you do to reduce, or better still, completely eliminate the risk? LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL |...
Once the pad frames have been removed, detach the venturi / fan assembly and the electronics module. For LCQ/LCS/TBQ/TBS & CPQ models, disengage the two venturi clips as shown. For LCQI/TBQI/TBSI & BMQ models, remove the 2 screws securing the venturi to the tank.
The flaps should move freely through 90º. It is recommended that at least 2 people move the cooler into position and that the transition, pad frames, venturi assembly and any unsecured objects are removed beforehand. CPQ/LCQ/LCS TBQ/TBS ILL983-B LCQI/TBQI/TBSI...
Position the cables in the dropper so they will be the assembly. accessible from inside the roof space. LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL |...
The following specifications for the cooler water Important! It is a requirement of Seeley International that all supply are required: coolers be connected to a dedicated circuit to the distribution board, with a separate circuit breaker and incorporate a separate Water Connection ½”...
Always install a shut-off valve (do not use a non-return type valve) close by the air cooler. ILL972-C ILL1676-A LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL |...
INSTALLING THE DRAIN VALVE BLEED FUNNEL Water drained from the cooler must be carried away to a (Standard for CPQ & BMQ models, optional for LCQ, LCS, suitable discharge point in accordance with local regulations. LCQI, TBQ, TBS, TBQI & TBSI models)
Once plugs are connected, switch the electronics module on. Important! Ensure the flexible splash protection cover is in place. For LCQI, TBQI & TBSI coolers The plug connection points differ from LCQ, LCS, TBQ, TBS, BMQ & CPQ models. WALL CONTROL...
7. If no buttons are pushed on wall control, after 3 minutes screen will reset to “OFF” state. Procedure to enter parameter mode must be re-initiated. ILL997-C LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL |...
Fault Code 04 (4 Red Flashes) = Failure to clear probes during drain within 4 minutes. ILL1014-I ILL2120-A LCQ, LCS, TBQ, TBS, LCQI, TBQI & TBSI coolers • Check the drain valve opens and water drains from the tank, BMQ & CPQ coolers with nothing obstructing the outflow of water.
COMMISSIONING COMPLETION CHECKLIST ADJUSTING COOLER SETTINGS cont POWER Within the SETTINGS menu of the MagIQtouch Controller is the COOLER sub-heading. Here various settings of the cooler can □ REGULATIONS - The power supply adheres to all local and be adjusted. national regulations and is wired back to the distribution board on its own separate circuit.
Run fan on "vent" for 10 minutes after cooling cycle to dry pads out. Heavy pad deposits. Clean or replace pads. LCQ / LCS / LCQI / BMQ / CPQ / TBQ / TBS / TBQI / TBSI EVAPORATIVE COOLER INSTALLATION MANUAL |...
Page 20
6 WITTON ROAD, FOUNDERSVIEW SOUTH, MODDERFONTEIN 1609, GAUTENG, SOUTH AFRICA It is the policy of Seeley International to introduce continuous product improvement. Accordingly, specifications are subject to change without notice. Please consult with your dealer to confirm the specifications of the model selected.
Need help?
Do you have a question about the LCQ and is the answer not in the manual?
Questions and answers