QUICK GUIDE

STEP 1
SAFETY
Read & understand the safety section.
STEP 7
SECURING LEG SUPPORTS
The telescopic leg supports (with feet
attached) slide up and down inside the
four corner posts.
STEP 13
ELECTRICAL REQUIREMENTS
DIAGRAMA DE CABLEADO EN EL SITIO
MóDULO ELECTRóNICO
GABINETE DEL SISTEMA
DE ENFRIAMIENTO
INTERRUPTOR DE
DESCONEXIóN OMNIPOLAR
SUMINISTRADO POR EL
INSTALADOR
CAJA DE EMPALMES
verde/amarillo
L2(EE.UU.)
FUENTE DE ALIMENTACIóN
PRINCIPAL
N(EUROPA)
STEP 22
FINAL CHECK
Test & complete the commissioning
checklist at the end of this document.
|
2
STEP 2
COOLER LOCATION
Check cooler location. Consider
regulations. Discuss with customer.
page 1
STEP 8
WEATHERSEAL
Check operation of the Weatherseal
FACTORY WIRING (DO NOT DISTURB)
TERMINAL BOX
HIGH
LOW
PUMP
HOT WIRE TO WALL CONTROL
GROUND/EARTH
COMMON/NEUTRAL
page 6
USA EA WIRING DIAGRAM - 2 SPEED
SINGLE PHASE 115V (LINE VOLTAGE
WIRED TO COOLER)
STEP 14
ILL959-B
WIRING DIAGRAMS
NO INTERFIERA CON LAS CONEXIONES ELÉCTRICAS DE FÁBRICA.
CAJA DE EMPALME
ALTO
BAJA
BOMBA
HILO CALIENTE AL CONTROL DE LA PARED
MASA/TIERRA
COM N/NEUTRAL
Ó
PUNTO DE PRUEBA ACTUAL DEL MOTOR
OPCIÓN 1 DEL CABLEADO
USA EA
DIAGRAMAS DE CONEXIONES ELECTRICAS DOS VELOCIDADES
MONOFASICO
115V
(LÍNEA DE SUMINISTRO CONECTADA PRIMERO AL ENFRIADOR)
PUNTO DE PRUEBA ACTUAL DEL MOTOR
page 9
STEP 23
CLEAN UP
Clean up the site!
page 16
page 4
WALL
CONTROL
HIGH
FIELD WIRING
OFF
FAN
LOW
CONTROL
VENT
PUMP
COOL
CONTROL
page 6
HOT WIRE/LINE VOLTAGE
GROUND/EARTH
COMMON/NEUTRAL
MOTOR CURRENT (AMP)
TEST POINT
ILL1026-A
CONTROL
DE LA
PARED
CABLEADO DEL CAMPO
ALTO
APAG
AVIENTE
BAJA
EL CONTROL
VENTILACIÓN
CONTROL
FRESCO
DE LA
BOMBA
-
L NEA CON CORRIENTE
Í
MASA/TIERRA
COM N/NEUTRAL
Ó
page 9
ILL1026-A
page 16
STEP 3
INSTALL ROOFJACK
Install 24G metal roof jack and
seal before mounting.
STEP 9
WATER REQUIREMENTS
Installation of the cooler water supply
must conform to local plumbing rules,
regulations and standards.
STEP 15
CHECK MOTOR AMPS
STEP 24
CUSTOMER HANDOVER
Show customer how to operate
the cooler. Explain maintenance
requirements.