MAINTENANCE

COMMERCIAL / INDUSTRIAL MAINTENANCE SCHEDULE

REQUIREMENTS FOR ALL COOLERS (EVERY 3 MONTHS OR TWICE PER YEAR)

Maintenance Schedule servicing should be performed before and after the summer season. We require that the following
components and the operation thereof, be inspected after the first 3 months of use, then serviced a minimum of twice a year for
commercial/industrial purpose.
For installations with high operation hours (coolers operating more than 800hrs per 3 months) or where regional regulations dictate,
additional 3 monthly maintenance of these components is required for the period the cooler is being used throughout the year.
*Additional Note: In areas with airborne dust, contaminants or debris, cleaning of the tank and cooling pads is required every 3
months.
COMPONENT CHECKS
Service Item
Pad Frames
Tank*
Chillcel Pads*
Pad Pins & Washers
Water Distributors & Hoses
Pump
Drain Valve (if fitted)
Bleed Funnel (if fitted)
Solenoid
Probe
Float Valve
Motor
Action
Check
Clean (if required)
Check
Clean (if required)
Check
Clean (if required)
Replace (if required)
Check / Adjust
Clean (if required)
Check / Adjust
Clean (if required)
Clean Filter
Check Operation
Replace (if required)
Clean
Check Operation / Adjust
Replace (if required)
Clean
Check Operation
Check Operation
Replace (if required)
Clean
Check Operation
Replace (if required)
Check Operation / Adjust
Replace (if required)
Check Operation
Replace (if required)
Service Year / Quarter
1
2
A
B
C
D
A
B
INSTALL AND OPERATION MANUAL EXT
3
C
D
A
B
C
D
|
19

Advertisement

Table of Contents
loading

Table of Contents