Vision REVO Product User Manual page 42

Hide thumbs Also See for REVO:
Table of Contents

Advertisement

ground connection
Step 9
In a lithium-ion power system, all non-current-carrying metal components and equipment
casings should be connected to the ground and nearby.In each device with protective
connection, the main grounding terminal shall be configured. In the case of multi-system
parallel operation, the main grounding terminal of each device shall be connected to the
conductor.The grounding conductor shall be copper conductor, the minimum section of
protective ground wire (PE) shall be no less than 6mm2, copper terminal must be installed,
and must be firmly pressed.
Figure 10.13 Ground(PE) connect
42

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents