Mechanical Installation; Installation Place - Vision REVO Product User Manual

Hide thumbs Also See for REVO:
Table of Contents

Advertisement

11
Power cable 3
12
Power cable 4
Power output cable
13
1
Power output cable
14
2
Communication
15
cable
Module fixed
16
screw
17
Bolt
18
DC breaker
SUGGESTED value
Working temperature
15 to 35° C

9.3 Mechanical Installation

9.3.1 Installation Place

The installation location of lithium battery plays a key role in its safety,service life time
and performance.It is recommended to install the lithium battery in a air-conditioned room.
blue yarn
95x1550x8,connect with B+, Red and red yarn
95x1000x8,connect with neutral,with SC95-8,
Blue yarn
95mm2 Blue insulator cap,Blue insulator cap
95mm2 Red insulator cap,Red insulator cap
Doubling piece with connector ,Length:
180mm
Stainless steel cross pan head bolt spring washer
flat washer assembly :M6*12
Stainless steel cross groove recessed hexagon head
bolt spring gasket flat gasket assembly M8*20
GB9074.13
NDM3Z-630/4341/630A DC24V
Working humidity
35 to 85%
Storage temperature
0 to 40° C
1
1
2
1
11
66
34
1
Storage humidity
5 to 85%
27

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents