Module - Vision REVO Product User Manual

Hide thumbs Also See for REVO:
Table of Contents

Advertisement

The measuring equipment with appropriate measuring range and in
line with the field working conditions
 Ensure the electrical connection of the instrument is correct,
3.3.8 Maintenance and repair
After the energy storage battery cabinet and UPS are disconnected, be
sure to confirm that they are disconnected before opening the front door
to maintenance or overhauling .
In the maintenance and overhauling operation, the following items should be concerned:
 Ensure the energy storage battery cabinet is not accidentally recharged
 Use a multimeter to ensure that the energy storage battery cabinet is without
ele
 Use insulation material to insulate the likely electric part of REVO .
 Necessary ground connection
It is strictly prohibited to carry out maintenance or repair when the
equipment is electric. At least two persons must be on site during
maintenance or overhaul of the equipment. The maintenance operation
cannot be carried out until the equipment cut off and the charging or
discharging has been completed .

4 Module

4.1 Module Specification
VISION REVO TP series back up batteries adopt the industry high capacity, high safety
standard and avoid the risk of arcing
12

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents