Loading List - Vision REVO Product User Manual

Hide thumbs Also See for REVO:
Table of Contents

Advertisement

 Please Check whether the package material is intact or damaged .
 Please check the quantity of the goods and type on packing list
 Please check the internal equipment (including modules, main control box, GBMS,
etc.) for any damage
9.2

Loading list

Take the TP200(512V100Ah) module with GBMS (display screen) as an example. The
other modules shall be subject to the material list actually attached to the cabinet:
Table 9.1 Loading list
Item
Name
1
Cabinet
Battery Module
2
3
CBMS
GBMS
4
Assembly
GBMS Supply
5
lines
6
Network cable
7
Terminal resistance
8
Copper nose
9
Power cable 1
10
Power cable 2
Description
600*1000*2000mm,As shown in the
drawings
51.2V100Ah,442*800*149mm
LUF16S10D630AD0,CBMS
Integrated display, GBMS+ display
Wire Length 1.5mm, both ends with terminal
Six class line ,length 3m with adding
gold-plated crystal heads at both ends
CAN Terminal resistance of communication
line
SC95-10
95x91x8, Module connection, Red and
blue yarn
95x120x8,connect with B- ,Blue and
unit(PCS)
1
10
1
1
1
1
1
3
11
1
26

Hide quick links:

Advertisement

Table of Contents

Troubleshooting

loading

Table of Contents