Pre-Installation
4
PREPARATION OF THE INSTALLATION SITE
FREESTANDING INSTALLATIONS
As a base, build a platform or flooring in reinforced
concrete, at least 10 cm thick, perfectly flat and suitable
for supporting the weight of the minipool and the people
using it.
The manufacturer suggests a minimum load of 485 kg/m
In any case contact a qualified construction engineer to
calculate the appropriate load for the installation site.
Wedges or shims cannot be placed under the
minipool to level it.
Remember to ground the structural reinforcement
in accordance with electrical codes.
Prepare:
A Drainage grating around the perimeter to help
•
preserve the equipment and the structure (even for
indoor installations).
B A non-slip flooring around the minipool.
•
See the plumbing and
electrical preparations on
page 11 and 15.
EN
For the preparation of the water and electrical
connections see the pertinent section on page 11
and 15.
.
2
Concrete slab h. 10 cm minimum, perfectly
level and able to support the weight of the
minipool + the weight of the people within
B
A
CONCRETE SLAB h. 10 cm min.
9
Rest
minipool
Non-slip flooring
Drainage grating