Siemens SICHARGE CC AC22 ERK Operating Instructions Manual page 90

Hide thumbs Also See for SICHARGE CC AC22 ERK:
Table of Contents

Advertisement

Inspecting safety devices
The charging station has at least one integrated residual current circuit breaker (RCCB) and
miniature circuit breaker (MCB).
Check all protective devices during commissioning in accordance with the national
installation regulations. You can only check the RCCB/MCB combination when the supply
voltage is present. To check the function of the RCCB/MCB combination, press the test button
"T" of the RCCB/MCB combination.
Checking the safety equipment
Check protective devices of the charging station every six months in accordance with
manufacturer instructions. Follow these steps to check the protection equipment of the
charging station:
1. Open the charging station.
2. Press the test button "T" on the respective RCCB/MCB.
The RCCB/MCB trips, the respective status light starts flashing red.
3. Activate the RCCB/MCB by flipping the fuse switch.
Check the function of the residual current circuit breaker (RCCB) by pressing the test button
"T". This test does not replace the measurement for resistance earthing (RE) or proper
condition testing for the protective earth conductor.
Note
Note that you must perform the above test for each RCCB/MCB of the charging station.
Depending on the configuration of the charging station, one charging station comprises
several RCCB/MCBs. According to national installation regulations, you must document the
respective tests carried out on RCCB/MCBs.
Note
You must immediately report any damage to seals, in particular damage to electrical
equipment or wiring, or missing seals or covers to the operator. Shut the unit down.
Maintenance of fans and filter mats
In the course of checking the safety equipment, check the function of the fans twice yearly
and replace the filter mats on a preventive basis.
Pollution may be lighter or heavier depending on the place of installation. Adapt the
inspection and replacement interval of the filter mats to the place of installation.
SICHARGE Operating instructions, ERK
Operating Instructions, 07/2020, A5E48571690-AB
Maintenance and service
8.2 Maintenance
89

Advertisement

Table of Contents
loading

Table of Contents