Installation Requirements - Evonic Fires Topaz Instruction Manual

Hide thumbs Also See for Topaz:
Table of Contents

Advertisement

INSTALLATION REQUIREMENTS:

INSTALLATION REQUIREMENTS:
INSET MODELS
This product has been designed to be installed into a standard 420mm(W) x 570mm
(H) x 80mm(D)
If the product is to be installed into an open chimney or flue, it is important that the
chimney flue is blocked off to prevent any up/down draughts and falling debris which
could restrict the airflow to the product.
It is also important to ensure that the product has a minimum clearance around it of
15mm, this is to ensure that the product can circulate the required airflow to the
heater unit.
The product should never be sealed into an opening with the use of silicones or
adhesives as this can alter the airflow and hinder any further servicing of the product.
Please refer to technical specification table for further information, with reference to
measurements.
HEATER UNIT CUT OUT—This is a safety feature to safe guard against further damage
to the product.
If the airflow is restricted the heater will automatically turn off. This can occur due to
incorrect installation or obstruction. To reset the heater function;
Isolate from main power supply
Leave product to cool
After suitable cooling down period, remove the obstruction if obstructed and
check installation
After 10 minutes the thermo switch (cut-out) in the heater will reset.
Please note that both the effect fan and heater fan omit a low decibel noise, both of
which are normal operating characteristics.
8.

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ev4iEv4i4Ev6iEv6i4Ev8s

Table of Contents