Installation; Installation Checklist Monitors - Swann AMU Rescon Operator's Manual

Table of Contents

Advertisement

AMU Rescon

Installation

3.
3.1.
Check
Installation
Electrical Con-
nections
Connect sen-
sors
Power-up
Instrument
set-up
Run-in period
14
Installation
Installation Checklist
Instrument's specification must conform to your power ratings.
Do not switch on power until all external devices are connected.
The transmitter is intended for panel mounting. The dimensions
are shown under
Dimensions of the AMU Transmitter, p.
Connect all external devices, see
Connect the power cord, but do not switch on power until all ex-
ternal devices are connected.
Electrical Connection, p.
Establish Sample Flow, p.
Switch on power.
First the instrument performs a self-test, displays the firmware
version and then starts normal operation.
Program all necessary parameters see
 Program the flow cell type
 Program the measuring mode (resistivity or conductivity).
 Program all sensor data (cell constant, temperature correction,
cable length).
 Program the required temperature compensation.
 Program all parameters for external devices (interface,
recorders, etc.).
 Program all parameters for instrument operation (limits,
alarms).
If the conductivity value of the sample is very low, the sensor
might need some time until the correct reading is displayed
Electrical Connection, p.
19.
25.
Programming, p. 25
15.
19.
A-96.250.351 / 230320

Advertisement

Table of Contents
loading

Table of Contents