Attach Lift Tool To Rack <= Ssr Task - IBM Power 775 Manual

Cec drawer rails service procedure
Hide thumbs Also See for Power 775:
Table of Contents

Advertisement

3.5
Attach Lift Tool to rack <= SSR TASK
CAUTION:
System or part is heavy. The label is accompanied by a specific weight range. (L009)
CAUTION: Do not remove or install this unit without using the provided lift tool. (C017)
Lift tool 74Y1087 is required for this service procedure due to the high weight of the CEC Drawer.
STEP 18
Position the Lift Tool to the front side of the rack as shown in Figure 12.
STEP 19
Attach Lift Tool via the two "Frame Front Mounting Brackets".
Tool-set: [3/8in-ratchet handle, 230in-lb torque clutch (PN 74Y0985), 30cm (12in) socket
extension, 5mm hex socket bit (PN 74Y0986) ]
STEP 20
Flip the two Rack mounting brackets out (A) towards the slots on the Rack. See Figure 13.
Power775 CEC Drawer Rails Service Procedure
PN: 41U8495, EC N44172
Figure 12 Position Lift Tool at front side of rack
Page 20 of 42

Advertisement

Table of Contents
loading

Table of Contents