IBM Power 775 Manual page 24

Cec drawer rails service procedure
Hide thumbs Also See for Power 775:
Table of Contents

Advertisement

Power775 CEC Drawer Rails Service Procedure
STEP 27
Raise the lift tool table just below the CEC Drawer to be removed. The platform is raised via
the Table Lift Drive, using the battery powered drill shipped with the Lift Tool. Note: Fully extend the platform
table to the open position during CEC Rail service
ATTENTION:
Use two hands to operate the battery powered drill as it is a high torque tool (see Figure 19).
Use the "Drill" setting on speed "LOW (1)" (Figure 20).
Be aware that when lowering the tool, as you approach the bottom of the lift table range, reduce
the speed of the drill to avoid high torque to the hands and drill slippage from the tool.
Required Tools:
Milwaukee Cordless Drill 2602-20 & Milwaukee 18V Lithium-ION Battery 48-11-1828
PN: 41U8495, EC N44172
Figure 19 Power Drill Operation – Correct Technique
Page 24 of 42

Advertisement

Table of Contents
loading

Table of Contents