Power775 CEC Drawer Rails Service Procedure
STEP 56
Locate the replacement CEC Drawer right and left side rails PN 45D9467 from the ship group.
STEP 57
Verify the rails are properly oriented for Rack installation(see Figure 31).
The rail end with the thumbscrew (A) is installed at rear of the Rack.
The two guide pins (B) face in toward the Rack key holes.
STEP 58
Install the rails into the Rack.
a) Facing the front of the Rack, position the left side rail guide pins with the appropriate key slots (A) and
(B) on the Rack. See Figure 32.
PN: 41U8495, EC N44172
Figure 31 CEC Rail Details
Figure 32 Rack features for Slide/Rail installation